• Bike looks like this. 👇

    It was the first frame I’d had done, and was a bit unsure of the process, so I’ll write a few notes. Apologies if everyone knows this. My brain needed a list.

    • Took 2-3 weeks from drop off to pickup.
    Mario said it was good to go then, but I left the frame for another 2 weeks before building it.

    • They send it off to be blasted and check the frame a bit
    In my case, he filled in a small dent.

    • He can mix up any colour you want.
    Can’t say how accurate this is, I just gave a brief of “dark, metallic blue”

    • I believe he has some logos / decals in stock
    But check if it’s something special, or bring along yourself.
    I didn’t want any decals personally.

    • Think they also organise powder coating, which is more durable.
    Not sure about price, but think it’s cheaper.

    • If you’re building the bike yourself, one thing I forgot was that I’d have to chase / tap any threads on the frame - to remove any stray bits of paint.
    Winston (Mario’s brother) did this on the BB, but I did it myself on the hanger & rack/mudguard mounts. Was easy enough. The relevant taps were £10 each from SJS.


    1 Attachment

    • R0003129-sml2.jpg
About

Avatar for steelspeed @steelspeed started