Ah great - I was emailing them over the weekend. Main question is if they can add some parts to it and also do it through C2W scheme. The Load4 60 cant do a double battery I don't think so I'm just mulling that over.
I have a double battery setup but prefer to carry the spare one with me rather than fit it, so that I only need to recharge one at a time. Otherwise both run down equally.
Ah great - I was emailing them over the weekend. Main question is if they can add some parts to it and also do it through C2W scheme. The Load4 60 cant do a double battery I don't think so I'm just mulling that over.