I wish these would have just fallen down. gonna power through and try to finish last 3 rooms tomorrow. then I can spend friday knocking the adhesive as flat as possible while I wait for the first lot of plasterboard to arrive.
speaking of, I fully expect them to arrive with a big lorry and then just dump it on the driveway and fuck off. when taking bulky deliveries should I be doing anything to make sure stuff is protected from damage from the floor when it arrives? it's 20 sheets of 2.4x1.2m and will be going straight out back to the empty summerhouse where it wont be in the way all the time and I have plenty of room to cut and make a mess.
I wish these would have just fallen down. gonna power through and try to finish last 3 rooms tomorrow. then I can spend friday knocking the adhesive as flat as possible while I wait for the first lot of plasterboard to arrive.
speaking of, I fully expect them to arrive with a big lorry and then just dump it on the driveway and fuck off. when taking bulky deliveries should I be doing anything to make sure stuff is protected from damage from the floor when it arrives? it's 20 sheets of 2.4x1.2m and will be going straight out back to the empty summerhouse where it wont be in the way all the time and I have plenty of room to cut and make a mess.