It pissed it down all Saturday so we worked as much as possible but really, it was just impossible to get anything done. The most we managed was getting the level right for the base in the centre, cutting it and fitting it in, with a little concrete to provide stability.
It pissed it down all Saturday so we worked as much as possible but really, it was just impossible to get anything done. The most we managed was getting the level right for the base in the centre, cutting it and fitting it in, with a little concrete to provide stability.
1 Attachment