Early doors it was apparent I'd fucked up. Soil was piling up in the skip super quick and we had to dig down to at least 150mm from the base of the structure which was going to be centred.
Taking that level across to the high point meant that one end was nearly 300mm deep.
So I bought some sleepers to build up one of our raised beds to get rid of some of the soil (which is nice quality) in there. Also decided that a long line of sleepers was the best to divide the garden from the chipped area so dug large whole for them.
Early doors it was apparent I'd fucked up. Soil was piling up in the skip super quick and we had to dig down to at least 150mm from the base of the structure which was going to be centred.
Taking that level across to the high point meant that one end was nearly 300mm deep.
So I bought some sleepers to build up one of our raised beds to get rid of some of the soil (which is nice quality) in there. Also decided that a long line of sleepers was the best to divide the garden from the chipped area so dug large whole for them.
By the end of Friday, we were here:
3 Attachments