You are reading a single comment by @Soul and its replies. Click here to read the full conversation.
  • Digging on the play area in the back garden starts tomorrow. Digging down to 200mm, levelling with sand, membrane then 150mm of softwood chips.

    Question I have is how to fix the playset (this thing). It comes with 30cm metal ground anchors which I can set into the earth but I don't just want to leave soil at the top level and dig a 'moat' around it that I fill with chips as the ground will shift with the weight.

    Burying the thing by anchoring it 15cm into the ground will mean the base will rot in the chips if water can't shift and it'll also mean the slide will have to finish below ground level by the same amount.

    I was thinking of using some treated sleepers (100mm high) to create a square underneath the frame. Anchor that to the ground then anchor the frame onto that. Worst case, I can replace the sleepers every few years if they rot.

    Any other ideas?

  • Digging down to 200m

    'kin 'ell!

  • treated sleepers (100m high)

    'faaaack

    etc.

  • The sleepers would have more surface area in contact with the rotty stuff. Can you do piers/pillars instead? Would allow for extra airflow underneath the structure.

    Sink four 4'x4' posts 2' into the gound that only come up to just above the surface of the chips and build off those. Postcrete is very easy to use and would be more than enough for that thing.

  • I have this coming next week for mini_com's birthday, with platform, without slide. I have a wellbeing day off work on Friday to build it. I will just be settling and levelling four of these to go under the feet. And probably treat the bases of each of the legs for good measure.

About

Avatar for Soul @Soul started