It's a bit hard to type out, but basically pipes are in the floor above, and come down into a broom cupboard and then turn right out through the wall into a rad.
They need to come from floor above and turn left to the adjacent wall.
It's going to be a vertical rad so I'd also hope the pipes can go into the top.
Ideally I'd like the pipes chased into the wall - but I expect this to be about 20-50cm.
The state of the half finished broom cupboard and accompanying collection of bags and other shit may send some people on here into cardiac arrest. Best not to risk it.