Finally collected the aluminum bar for the stem jig and got it assembled. Tubing is here and the binders should arrive from Ceeway next week.
Pleased with how the jig has come together, it's nice and solid with no play. It should help keep all of the tubes in place while they're tacked and the extension tube is filed/fitted. Bolts just need to be trimmed a bit to remove the stack of washers.
I've got bar for 1" and 1 1/8" steerers and 22.2, 25.4 and 31.8mm bars. Plenty of space for >150mm stem lengths and big rises.
Finally collected the aluminum bar for the stem jig and got it assembled. Tubing is here and the binders should arrive from Ceeway next week.
Pleased with how the jig has come together, it's nice and solid with no play. It should help keep all of the tubes in place while they're tacked and the extension tube is filed/fitted. Bolts just need to be trimmed a bit to remove the stack of washers.
I've got bar for 1" and 1 1/8" steerers and 22.2, 25.4 and 31.8mm bars. Plenty of space for >150mm stem lengths and big rises.
3 Attachments