• Just had a quote of £6000 to redo a 3x3m bathroom (London) to do the whole thing (separate shower/bath, toilet staying in the same place) excluding supply the suite/tiles. Is that within the expected range? I can't keep up with trade inflation any more

  • MIL paid about £7k (inc cheapish suite and tiles) all-in for a similar thing (although moving stuff around in the room) a year or so ago.

About

Avatar for aggi @aggi started