• Bonus points for getting the driver to honk/toot the horn. Are they still doing the resurfacing along the path?

  • True dat.
    They seem to have stopped for now, the bit from cawston to about a mile or so outside Wroxham are still to be done. That’s the bit with bridges etc so I’m guessing they’ll leave that.

About

Avatar for Chaley @Chaley started