• About 30% of the wiring, an interior (just seats and a blank dash really) and an exhaust. Then a spanner check and geometry. That’s it. It really should be a week’s solid work max.

    But I’ve moved to a house with one less garage space than I have cars so it’s in a rented garage under a sheet behind half a dozen bikes.

About

Avatar for Hefty @Hefty started