• So fucking fed up.

    Builder did his own plumbing near the start of the rip out which caused a huge leak

    Their plasterer spilled laster which has made its way to the downstairs lights . Turning on the shared hallway light tripped flat 2's flat somehow and their macerator which flooded the downstairs flat

    100% late (in week 6 of a 3 week job) and regrettably paid 90% of it. Also had to get my own plumber in at a cost of £410 to make it livable in due to them taking too long

  • What the fuck. Document all of this properly and don't pay another penny until everything is fixed. Ideally you should get back/knock off the total cost the £410 plumbing bill as well.

    Very best of luck, I hope others here or people you know can assist with getting shit fixed and finished!

About

Avatar for si_mon628 @si_mon628 started