  • The customer says oh this needs done and delays the brickie for 6 months. In that 6 months the price will probs change and then it liable to the customer.

    You've added extra conditionality there - if the delay happens post hoc and is the customer's fault that's a different scenario to pricing up a big job one day-1 with knowledge that there will be inflation between agreeing the price and actually supplying the materials.

    The difficulty for the homeowner is that the contractor has them over a barrel once the job starts as the WIP is worth zero (or less) if the contractor phoenixes and they have to get someone else in.

  • I mean if you asking about a job that Id do you want heating full system. I come in size it up, order the materials and you pay X I dont give a break down to how I got that figure. The price is the price. I'm not getting paid for the time I had to come to site visit and the sit at home work it out and then order all the right stuff so that's built into the price.

    Say I need something that I have missed in the price, I wouldnt go to the customer "oh i forgot this its gonna be extra" Id swallow that cost. Sometimes you win on a job and something you lose.

  • That sounds completely reasonable and doesn't cut across anything I've been trying to say.

  • What about the radiators in this eg?

    As a customer I may have a preference on style. You tell me what size and heat output I need, but it's likely I'd like to choose between them. Do you add x% on to all of the rads?