Wheels set up tubeless and crank bolts stripped from red ano and polished up.
I'll setup drive train tomorrow as much as possible but waiting for the proprietary BB tool to complete the build.
Wheels came with 12mm endcaps front and rear and I need 15mm for the front so waiting for that to arrive as well.
Wheels set up tubeless and crank bolts stripped from red ano and polished up.
I'll setup drive train tomorrow as much as possible but waiting for the proprietary BB tool to complete the build.
Wheels came with 12mm endcaps front and rear and I need 15mm for the front so waiting for that to arrive as well.
5 Attachments