Crossrail

Posted on
Page
of 2
Prev
/ 2
  • " Roger Hawkins of Hawkins\Brown tells how his wife gave birth to their son the night after he was interviewed for the Tottenham Court Road commission. The lad will turn 30 next week. "

    https://www.theguardian.com/uk-news/2022/mar/13/elizabeth-line-crossrail-opening-london

    come on, hurry the fuck up crossrail

  • TfL have changed the bicycle policy for the Elizabeth line. Previously it was no bikes in the tunnel sections. Now it is bicycles allowed off peak. Good to see and matches the sub-surface lines.

    https://tfl.gov.uk/modes/cycling/cycles-on-public-transport

  • Sensible for a change.

    Now we just need Eurostar to fix their nonsense.

  • did most of the london bits yesterday on a trip to central
    maryland to liverpool street
    change at liverpool street onto the paddington section all station platforms look very similar and very long, went and had a look at farringdon from the inside huge great glass roof over the excavation of the concors looked massive, then on to paddington alighted and crossed the platform and headed back to oxford street
    on the way home took the route to abbey wood, good to piece together the bits i've seen being built while riding with the actual railway itself, switched platforms at abbey wood and back to liverpool street, switch train then home.

    fast smooth spacious long and hopefully take a bit of footfall away from other routes lowering congestion at peak times. epic project of epic proportions through the sprawling city of london, hats off to them.

    how full is it during rush hour ?
    how will the section from essex connect with the paddington branch, there was no real sign of any new tunnels before liverpool street ? i can't work out how they'll join up, or will you always have to get off the train at liverpool street and walk to the paddington - abbey wood section ?

  • how will the section from essex connect with the paddington branch, there was no real sign of any new tunnels before liverpool street ?

    There is a tunnel portal, next to Pudding Mill Lane DLR

    There will still be some Shenfield trains which terminate at Liverpool Street high level but I think most will go into the tunnel.


    1 Attachment

    • Screenshot 2022-06-01 144927.png
  • The two branches will join up right under Stepney Green Park. There's a disguised ventilation shaft in the park at the exact spot. Openstreetmap shows it.


    1 Attachment

    • Screenshot_20220601-164813.png
  • Post a reply
    • Bold
    • Italics
    • Link
    • Image
    • List
    • Quote
    • code
    • Preview
About

Crossrail

Posted by Avatar for Oliver Schick @Oliver Schick

Actions