Part of the toe rail had been badly painted, water had crept in and it had caused rot. The rotten wood was chopped out, a new rail laminated, then glued and screwed. Teak plugs over the screws, left to set, planed, primed. This work was done by a professional boat builder, far beyond my abilities!
Part of the toe rail had been badly painted, water had crept in and it had caused rot. The rotten wood was chopped out, a new rail laminated, then glued and screwed. Teak plugs over the screws, left to set, planed, primed. This work was done by a professional boat builder, far beyond my abilities!
4 Attachments