You are reading a single comment by @hugo7 and its replies. Click here to read the full conversation.
  • Order times for Hormann doors are currently 30+ weeks, so looking at Ryterna, but with a Hormann operator. Lead time 8 weeks for those.

    The chap came out to measure up for a final time before placing the order- the side hung doors for the workshop come in a steel frame which you don’t want to get wrong, dimensionally.

    Discussion currently is how tall we make the doors- originally they were around 8’, which makes for very large doors.

    The floor in the garage is concrete covered in a dense layer of compacted shit- thinking of hiring a concrete scrabbler to take off the top layer. Is there a way of doing this whilst guaranteeing that the floor you create is flat?

    I’ll resin seal it afterwards which may level it a little, but if the base is flat then that makes things more straightforward I imagine.

  • Is there a way of doing this whilst guaranteeing that the floor you create is flat?

    Have a search in the DIY thread as iirc someone was looking at doing exactly that.

    In terms of base/flooring have you read that epic pistonheads thread on garage flooring? If not might be worth a skim.

About

Avatar for hugo7 @hugo7 started