Order times for Hormann doors are currently 30+ weeks, so looking at Ryterna, but with a Hormann operator. Lead time 8 weeks for those.
The chap came out to measure up for a final time before placing the order- the side hung doors for the workshop come in a steel frame which you don’t want to get wrong, dimensionally.
Discussion currently is how tall we make the doors- originally they were around 8’, which makes for very large doors.
The floor in the garage is concrete covered in a dense layer of compacted shit- thinking of hiring a concrete scrabbler to take off the top layer. Is there a way of doing this whilst guaranteeing that the floor you create is flat?
I’ll resin seal it afterwards which may level it a little, but if the base is flat then that makes things more straightforward I imagine.
Order times for Hormann doors are currently 30+ weeks, so looking at Ryterna, but with a Hormann operator. Lead time 8 weeks for those.
The chap came out to measure up for a final time before placing the order- the side hung doors for the workshop come in a steel frame which you don’t want to get wrong, dimensionally.
Discussion currently is how tall we make the doors- originally they were around 8’, which makes for very large doors.
The floor in the garage is concrete covered in a dense layer of compacted shit- thinking of hiring a concrete scrabbler to take off the top layer. Is there a way of doing this whilst guaranteeing that the floor you create is flat?
I’ll resin seal it afterwards which may level it a little, but if the base is flat then that makes things more straightforward I imagine.