• just had my bathroom done (12m²) and the cost was about over £10.5k for labour and parts

    That was for a full rip out, moving pipes, new waste, tiles 3/4 up the wall and new plaster above that. Timber frame to square off walls, hide pipes etc. Included new bath, shower, sink, tiles, toilet, radiator etc etc.

    Disposal of all waste included and finished to a very high standard of work