You are reading a single comment by @Cupcakes and its replies.
Click here to read the full conversation.
-
Cheers, a useful reference.
Same to you @edscoble many thanks, albeit I am in Scotland. By the by, the pics of the work on your new place look great.
just had my bathroom done (12m²) and the cost was about over £10.5k for labour and parts
That was for a full rip out, moving pipes, new waste, tiles 3/4 up the wall and new plaster above that. Timber frame to square off walls, hide pipes etc. Included new bath, shower, sink, tiles, toilet, radiator etc etc.
Disposal of all waste included and finished to a very high standard of work