You are reading a single comment by @apc and its replies. Click here to read the full conversation.
  • Crime indeed! Luckily no need to get reclaimed timber as it gonna get painted white, the main support is fine also, and kitchen will be replaced with a budget Wren type.

  • Insulating, it originally have tiles on top of several layers that result in damp, which came from a previous leak of the sink and boiler (both been rectified) and it doesn't allow it to breathe (photo before original timber being removed)

    The floor, wood and insulating alone is a little over 2 grand, a massive chunk.

About

Avatar for apc @apc started