• Made such a dramatic difference. Flooring and steps down to the bathroom in the back dormer are pretty much done too so it's really starting to feel like a proper room up there.

  • Good stuff. Sounds like ours are pretty much neck and neck.

    Have got to go:

    Plastering - tomorrow
    Windows - next week
    Roof tiling - next week
    Bathroom tiling - next week/week after
    Second fix carpentry, electrics, plumbing all here and there for next few weeks.

    Seeing decorator and carpet layer at the weekend.

    I can’t wait to be using the storage space more than anything.

  • I think we started a few weeks before you but our balcony windows being delayed and bathroom suite getting cocked up has thrown everything out of wack a bit.

    I can’t wait to be using the storage space more than anything

    Ha, yeah we're going from zero storage to having an absolute cavern to chuck stuff in!

About

Avatar for J0nathan @J0nathan started