• Yep, ours was a nightmare, we have the pumped in liquid screed to cover the UFH. From memory it took nearly 4 months until it was ready for the flooring, in the end we ended up installing the kitchen before the flooring, which means if we ever want to move our island we will have to patch the flooring.

    We ended up moving in and living on a dusty floor for a couple of months, was not fun!

  • After watching too many YouTube videos I thought they would pump the screed in, but instead I had a couple of sweaty guys with wheelbarrows and and a screed guy who had finished by 11:30am.

    Lo-tech still works I guess!

  • I think after the builders barrowed in 150sqm of concrete 6 inches deep for the sub floor I don’t think they fancied doing the screed the same way!

About

Avatar for Acliff @Acliff started