You are reading a single comment by @dancing james and its replies. Click here to read the full conversation.
  • Left over cladding from when we did the house extension. It’s actually for the composting toilet which is part of her wood cabin office. The interior is mesh lined panels and I have put left over insulation panels up and need to cover them up.

    I have an air compressor for tubeless tyres, cleaning chainsaws etc so have ordered an ace & k brad nailer (I also have about 1.5k left over stainless brad’s).

    So all in all the job cost is the nail gun which will be used on future work too.


    2 Attachments

    • 03C3DAA5-623C-4471-B91F-2135172F74D4.jpeg
    • 2F7CA169-8F6E-4AD2-A386-AB25F1B23451.jpeg
About