took delivery of half a ton of paving slabs today to add some ballast.
sub floor in front half should be screwed down tomorrow - I have made a little step to where the baseplate curves up at the front.
lost a few inches of headroom but this will become the cabin/bedroom and better than a curved floor. in trying to save every mm I’m worried there might be a bit of flex but will revisit when the other half is done if so.
took delivery of half a ton of paving slabs today to add some ballast.
sub floor in front half should be screwed down tomorrow - I have made a little step to where the baseplate curves up at the front.
lost a few inches of headroom but this will become the cabin/bedroom and better than a curved floor. in trying to save every mm I’m worried there might be a bit of flex but will revisit when the other half is done if so.
3 Attachments