• 6 by 2 with 3 inch depth is a happy hour at most with a sledgehammer, thinking about your boss/in laws/accountant/Boris Johnson is helpful. Hit a corner about 6" in and work your way inwards.

    If you are built to climb and not descend, a medium breaker of around 16kg will do the job efficiently in 15 minutes and cost about £20 to hire (use a chisel rather than a point).

    Anyone looking to buy a breaker, I can recommend the Screwfix own brand one (Erbauer), I've had mine for 3 years of very frequent use and it won't die, currently £200.

  • They said 3 feet deep

    Oh lol I did, oops. Yeah, if it was 3 feet deep I’d be leaving it there for the rest of time. Tasteful gravel layer over the top maybe.