Looks really neat and tidy and yes, I would pay a bit extra for the electrician to do it by the book. but unfortunately most tradespeople I have hired to date have let me down in some way. I might just be too much of a perfectionist.
For future reference be careful with conduit and cabins as they do rise and fall substantially throughout the year and nothing is fixed to the timbers, everything has to slide vertically e.g. the door frame isn't screwed to the logs, but just slotted in.
I’m very aware of this! Need to trim a couple of bits of pvc where I didn’t leave enough slack but otherwise it’s all expanded and contracted without issue. I made sure to not glue the joints for this exact reason.
An actual hole between boards seems like a construction/design fuck up to me tho!
Looks really neat and tidy and yes, I would pay a bit extra for the electrician to do it by the book. but unfortunately most tradespeople I have hired to date have let me down in some way. I might just be too much of a perfectionist.
For future reference be careful with conduit and cabins as they do rise and fall substantially throughout the year and nothing is fixed to the timbers, everything has to slide vertically e.g. the door frame isn't screwed to the logs, but just slotted in.
(from https://www.timberbuilding.co.uk/index.php?main_page=page&id=77)