You are reading a single comment by @konastab01 and its replies. Click here to read the full conversation.
  • I think some of this is solved by trades breaking quotes into labour vs parts - I've had some very silly quotes through for different work and it's hard to work out if they're pricing themselves out or if I'm asking for an expensive thing.

    Best people I've had in have been up front about their day rate and given an estimate of how long it will take and a ballpark for parts - even if it's verbal only before a written quote which encompasses the whole lot.

  • The problem is the price doesn’t really include just your day rate for say plus material. It includes say it breakdowns the manufacturer wants you the customer to call the installer first. I’m not going to get paid via the visit, it might be something stupid, it might not be but that’s also built into the price.

    Breaking down a full quote is far too much effort and you price the full job as the job when you start going into full quotes it’s. Well I’ve only quoted you for one length of pipe and I’ve ended up using 5 etc etc if that makes sense.

    Day rates make more sense when your say on a longer term project instead of a full price I think but even then people can take the piss and lengthen them out. I mean most joiners day rate is start at 10 and finish at 3 with a lunch. That’s no a fuckin day

About

Avatar for konastab01 @konastab01 started