Not DIY but maybe someone here has DIY’d something similar:
I want to pull out this basic bitch rad and replace it with a vertical unit next to the window where the plug socket is.
Floor is engineered wood on floorboards.
What would I be looking at £ wise and disruption wise to have the floor taken up to move the pipe run to connect up the new rad then the floor put back as it was?
Would have the plug socket moved so it can flank a bed placed where the rad was.
Two new (basic bitch) rads installed while they were swapping our hot water system. Needed floorboards lifted and pipework re-jigged. Charged us £300 for both.
Not DIY but maybe someone here has DIY’d something similar:
I want to pull out this basic bitch rad and replace it with a vertical unit next to the window where the plug socket is.
Floor is engineered wood on floorboards.
What would I be looking at £ wise and disruption wise to have the floor taken up to move the pipe run to connect up the new rad then the floor put back as it was?
Would have the plug socket moved so it can flank a bed placed where the rad was.