So there's a lot of stuff to be done. Most of the house itself needs a refurb on the inside and some maintenance on the outside, but it's all in useable condition for now. First major project will be sorting out some storage for both regular and bike stuff. The shed at the back of the garden will have insulated walls and roof and the covered part at the rear will be fully enclosed and insulated too. Will probably have to pour a new floor as well.
So there's a lot of stuff to be done. Most of the house itself needs a refurb on the inside and some maintenance on the outside, but it's all in useable condition for now. First major project will be sorting out some storage for both regular and bike stuff. The shed at the back of the garden will have insulated walls and roof and the covered part at the rear will be fully enclosed and insulated too. Will probably have to pour a new floor as well.
3 Attachments