• We were quoted 4 for work ~9 months ago and that seemed like a lot then (priced up at ~3 for suite, tiles and other fittings). We will need new floor, walls back to brick and replaster but it still seems bonkers. Only going half tiled, static shower screen, not moving toilet, no electrics other than extractor and I'll probably run wires for that anyway.

  • I paid about 4k In Manchester 9 years back, on a back to brick bathroom job, including changing the layout.

    Bathroom costs on the refurb I'm currently doing come in at 9.5k . It's a pretty extensive scope of works. Lots of plumbing work (the room was previously a bedroom) , couple of custom elements, wet floor, and decent level of finish . So it's absolutely possible to come in well under 9k

About

Avatar for chrismanc @chrismanc started