Bottle bosses are done and internal routing is almost done. Just needs a bit of emory cloth.
I did the seat tube clamp slot on the mill today. Normally I just eye ball it post welding the frame, but the new me did it while drilling holes for bottle cage bosses. The result speaks for itself.
I am really digging this more considered and thoughtful process that comes with experience. If only my TIG welding would look a bit more pro.
Hopefully I'll be able to do the flat mounts on Sunday and then tack the frame. Everything is moving a long slowly but I am feeling pretty good about the process and the end result will be better if I take my time and keep testing and practicing.
More on the road bike.
Bottle bosses are done and internal routing is almost done. Just needs a bit of emory cloth.
I did the seat tube clamp slot on the mill today. Normally I just eye ball it post welding the frame, but the new me did it while drilling holes for bottle cage bosses. The result speaks for itself.
I am really digging this more considered and thoughtful process that comes with experience. If only my TIG welding would look a bit more pro.
Hopefully I'll be able to do the flat mounts on Sunday and then tack the frame. Everything is moving a long slowly but I am feeling pretty good about the process and the end result will be better if I take my time and keep testing and practicing.