Water butts.
They’re usually set up with a diverter pipe from a down pipe. Any reason why I can’t put the whole down pipe in? Catchment area is a flat roof approx 8m2.
I guess it will overflow?
8sqm x 50mm of rain (one day of heavy rainfall) = 400 litres = your water butt overflowing
I’ve got a really big butt.
😉
@lemonade started
London Fixed Gear and Single-Speed is a community of predominantly fixed gear and single-speed cyclists in and around London, UK.
This site is supported almost exclusively by donations. Please consider donating a small amount regularly.
Water butts.
They’re usually set up with a diverter pipe from a down pipe.
Any reason why I can’t put the whole down pipe in?
Catchment area is a flat roof approx 8m2.
I guess it will overflow?