Ordered the desk 2 days ago, and it turned up this morning.
Also received 2 of the 3 Elgato Multi Mount L's, and the K&M microphone mount.
The problem now is that I haven't prepped and painted the room yet. Won't get a chance this weekend to do more than the basics, and in reality I thought this stuff would take a month to turn up so I now need to store everything whilst I prep the room.
Room prep is going to need:
Temporary decabling of everything in there, and a temporary recabling of bare minimum internet.
Clean all walls and ceiling, fill holes, sand, mask everything off, etc.
Paint all surfaces except floor.
Recable the existing setup.
Install full-wall shelving (which I haven't yet ordered).
And then I can move things in.
The existing stuff in the room that will need recabling just so that I can paint the wall behind the rack: Media PC, NAS, 2 switches, router, controller, Raspberry Pi x 2, Wi-Fi AP, Hue hub.
My stuff has started arriving.
Ordered the desk 2 days ago, and it turned up this morning.
Also received 2 of the 3 Elgato Multi Mount L's, and the K&M microphone mount.
The problem now is that I haven't prepped and painted the room yet. Won't get a chance this weekend to do more than the basics, and in reality I thought this stuff would take a month to turn up so I now need to store everything whilst I prep the room.
Room prep is going to need:
And then I can move things in.