All holes are in sensible places. They range from 1.8 to 2.5mm. There's pics and vid in the Bikeforums thread.
That pic is showing the charging plug and jack harvested from the BCR2 and the A-junction, separating the loom between the frame and fork, hotglued into place behind the head tube. There's no hole drilled there.
ETA: huh, you grabbed that pic from the build thread, so you saw the process. Why'd you illustrate your comment with that pic?
All holes are in sensible places. They range from 1.8 to 2.5mm. There's pics and vid in the Bikeforums thread.
That pic is showing the charging plug and jack harvested from the BCR2 and the A-junction, separating the loom between the frame and fork, hotglued into place behind the head tube. There's no hole drilled there.
ETA: huh, you grabbed that pic from the build thread, so you saw the process. Why'd you illustrate your comment with that pic?