Restarting the Shed thread. Just poured 4 cubic metres of concrete for the back wall and base of my 'shed'. One wall backs on to the kitchen and the roof was already there so I had half the work done already. Had to excavate the same amount of dirt as concrete that was put back as the clay slope behind was tumbling in to the space. Excited to start building up the walls and getting the bikes hung. The floor measures about 3m x 3m, hoping to squeeze in 7-8 bikes along the back wall on Steadyracks. Door on the right hand side and workbench along the front with a window above.
Restarting the Shed thread. Just poured 4 cubic metres of concrete for the back wall and base of my 'shed'. One wall backs on to the kitchen and the roof was already there so I had half the work done already. Had to excavate the same amount of dirt as concrete that was put back as the clay slope behind was tumbling in to the space. Excited to start building up the walls and getting the bikes hung. The floor measures about 3m x 3m, hoping to squeeze in 7-8 bikes along the back wall on Steadyracks. Door on the right hand side and workbench along the front with a window above.
1 Attachment