I'm going to be pulling down the plasterboard and renewing the insulation over the summer as it seems to be 50mm fiberglass behind the plasterboard and viewed with an IR camera there's several places with none (or very poorly fitted)
First job was moving a lighting junction box so I can pull up a section of loft flooring and replace the mass of wires with insulation. It turns out there were three additional round JBs stashed under the floor and covered by insulation.
Some wires were rather long, but so too short to get to the centre, so still ended up with four boxes, but they are now fixed above any insulation and about 15m of spare cable has gone.
I'm going to be pulling down the plasterboard and renewing the insulation over the summer as it seems to be 50mm fiberglass behind the plasterboard and viewed with an IR camera there's several places with none (or very poorly fitted)
First job was moving a lighting junction box so I can pull up a section of loft flooring and replace the mass of wires with insulation. It turns out there were three additional round JBs stashed under the floor and covered by insulation.
Some wires were rather long, but so too short to get to the centre, so still ended up with four boxes, but they are now fixed above any insulation and about 15m of spare cable has gone.
2 Attachments