Shopping list:
5x 4.8m 4x2 treated stabilised
7x 4.8m 150mm boards
6x 4x4 posts(guess I want 2-300mm in the ground)
Decking screws
Structural screws(I’ve prob got a few boxes at work that’ll be big enough)
25kg ballast
1bag cement
Membrane(got)
Preservative
Anything I’ve missed? Will one bag ballast do 6 posts if I don’t get carried away and dig massive holes?
Shopping list:
5x 4.8m 4x2 treated stabilised
7x 4.8m 150mm boards
6x 4x4 posts(guess I want 2-300mm in the ground)
Decking screws
Structural screws(I’ve prob got a few boxes at work that’ll be big enough)
25kg ballast
1bag cement
Membrane(got)
Preservative
Anything I’ve missed? Will one bag ballast do 6 posts if I don’t get carried away and dig massive holes?