You are reading a single comment by @NotThamesWater and its replies. Click here to read the full conversation.
  • Progress has been minimal - Building a desk top took up most of my spare time recently, plus lockdown and all that.

    I have completed the decking, using all composite materials, and I have cut most of the wood to length.

    I have been let down by the steel people, unfortunately, and am still trying to find a local firm that can also do on-site welding, but that doesn't cost a fortune.


    1 Attachment

    • IMG_20210426_090305.jpg
  • That’s a shame @TW good luck with getting your project back on track.

    I got my garden cleared late last year, back third i'll put down weed preventer sheet, sharp sand, pea shingle, I decided to go down the plastic crate base route and build off that. fingers crossed I get the lawn down this week also, forecast looks meh. If I manage to get to stage 10, (see sketch below), I’d be happy to lounge on it during the intervening periods. I’m still debating with my self about adding a green roof to this she-cave. That’ll piss her right off, cos it’ll attract all sorts of fauna..

    It’s a garden babes, what do you expect having critters munching on your tea and crumpets

  • on-site welding

    Forgive my ignorance but what needs welding? The flitch beam?

    I assumed that was just bolted together.

About