-
Good idea - will broach it with the sellers via their solicitors and find out how long ago it was done. I assume it is still a good idea to mention the full amount of work estimated incase there is any room for negotiation.
The surveyor seemed to suggest that it was highly unusual to have concrete , plastic membrane (seemed to suggest plastic was a bodge) then flooring so I was worried that we would have to rip it all up and put down a resin membrane which would be a pretty significant cost.
Victorian Terrace.
@TW This was just a general full survey including structural on a house we've had an offer accepted on