As it won't be seen above soil level it doesn't have to be pretty, besides, blocks never are.
You would need 36 blocks, a ton of concrete and half a dozen bags of sand, total cost approx £250. See picture below for how to lay them (note: yours is not high enough to need steel rod). I would tap the lowest course of the 3 into the foundations before the concrete went off, less mortar and stronger fix.
A grand should get it done if you are employing someone.
As it won't be seen above soil level it doesn't have to be pretty, besides, blocks never are.
You would need 36 blocks, a ton of concrete and half a dozen bags of sand, total cost approx £250. See picture below for how to lay them (note: yours is not high enough to need steel rod). I would tap the lowest course of the 3 into the foundations before the concrete went off, less mortar and stronger fix.
A grand should get it done if you are employing someone.