  • I'm in the process of getting quotes for a 3m-ish load bearing wall knocked down, a steel inserted, over-boarding the ceiling, plastering and making everything "good" plus the doorway into the room being widened (non load bearing) and making good.

    Things not included are fixing flooring or installing doors.

    First quote has come in at just over £6k which may or may not include plastering. That seems very high to me especially with the may/may not include plastering. Anyone done anything similar and can reveal indicative costs?

    We're not London either, in Scotland.

  • I've not had similar done but have considered it.

    Doesn't sound crazy high to me, but the other quotes will be the best comparison I reckon. You are getting other quotes?

    Are you paying for engineer's fee, paperwork such as building warrant, etc in the ~£6k or are those additional?