-
LRM Regulation 1.3.5 For events where the rate of climbing is greater
than 11 meters per kilometre the President will give consideration to
requests for extra time. This will normally be based on a 5% allowance
for every full m/km of extra climbing (examples are given in Appendix
3). Specific authority to adopt these allowances must be sought from
the LRM President.I calculate this as a 160 hour allowance.
184 hours? That’s more than a week! That can’t be right.