I haven't re-tiled the floor (that needs a bit of a clean up when everything else is finished) but filled in under the bath with 18 mm marine ply over the exposed joists.
The whole bathroom and kitchen were tiled before, (some over previous tiles) - took days of stripping out and 100s of rubble sacks. Grim job.
Got a plasterer in for that part. Well above my paygrade!
The crappy brick wall behind the sink in the photo above was just plastered. The stud walls which I had destroyed removing tiles (not shown) were boarded and skimmed.
I haven't re-tiled the floor (that needs a bit of a clean up when everything else is finished) but filled in under the bath with 18 mm marine ply over the exposed joists.
The whole bathroom and kitchen were tiled before, (some over previous tiles) - took days of stripping out and 100s of rubble sacks. Grim job.