I haven't re-tiled the floor (that needs a bit of a clean up when everything else is finished) but filled in under the bath with 18 mm marine ply over the exposed joists.
The whole bathroom and kitchen were tiled before, (some over previous tiles) - took days of stripping out and 100s of rubble sacks. Grim job.
In tiling chat, over the weekend I did this. Very satisfying. (and 1 x 15kg tub used).
Grouting tonight.