Entire structure is brand new, freshly boarded and skimmed, so shouldn't be that (or at least, if it is, I'm annoyed at the wrong trade).
And I take the point about wanting enough to be sure that the job is done. Ultimately I'm probably quibbling over £60, but I think I KNOW that they've been a bit too liberal with materials
Entire structure is brand new, freshly boarded and skimmed, so shouldn't be that (or at least, if it is, I'm annoyed at the wrong trade).
And I take the point about wanting enough to be sure that the job is done. Ultimately I'm probably quibbling over £60, but I think I KNOW that they've been a bit too liberal with materials