-
Cheers goes off to find hammer
Really though, it seems like I can pay them to do this, although looking at the set up it'll need to be the whole board really which probably means I need to get the supplier in at the same time to move the meter. Gah.
Can they extend a supply cable do you know? If I could move the whole lot up a foot that'd be a much better resolution.
Edit: when I looked in to it last I don't think you can, which is what landed me at the above plan.
I think they have to be on a board and the board is the property of your electricity distribution network operator.
If it wasn't people like UKPN wouldn't offer to replace damaged ones for free: https://www.ukpowernetworks.co.uk/electricity/replace-meter-board