  • Does anyone have an idea of a rough cost installing a bathroom upstairs (ignoring the cost of the suite)?

    Water is available, and mains/waste pipe is just below.

  • It really depends how long it takes plus all the materials. Doing a full bathroom can take a week depending on what your doing or is it a just connect everything you've done all the other work?

  • At present it's currently a fourth bedroom but with pipework under the floorboards capped.

    Would be installation and plumbing in. Would be looking at sorting the tiling etc myself.