Thanks for that. Would that 50k have included the staircase build? (just that it would be unfinished?)
My next biggest unknown is budgeting to re-fit the existing bathroom. It's very small and would get rid of bath and have new sink, toilet, enclosed shower.
The door currently opens inward, which is a huge pain. Would there be any regs preventing it opening outward?
1 Attachment
-
The project I mentioned included the staircase, but not the finishes.
The reason finishes were completely removed from the above is because the client was looking to do the loft and side extension at the same (or in this instance one after the other) as @Gewürzt mentioned.
The general contractor couldn't complete with the quote from the dormer specialist (or didn't want to!), but definitely had a better level of care and attention along with finishing.
I assume you are London based? The last side-hustle L-dormer project I worked on was mid-2017. The dormer was near identically sized and planned to the estate agent plans above including rooflight/window quantities. The client ended up choosing a dormer specific company who priced the works at £50k (inc VAT).
Worth noting that the quote excluded:
You will need to allow for the above and general inflation, so I would allow a decent bit of top of the above to cover everything.