Electrics in, and some more plumbing sorted out (a side quest involving putting the taps the right way around in the bathroom). The electrics was a bigger job involving cabling a 20m run from the fuse box for each of the different circuits (sockets, boiler, hob) and chasing that at both ends and also routing the cables through the roof to get from one end of the house to the other. Additional work to chase and place all of the socket points needed. You can see in the photos where this cabling all now emerges from the ceiling in the wall where the cooker and boiler are.
Whilst this happened the builder handled tidying up the outside, repairing brickwork, repointing where needed around it, filling holes, etc. And aside from minor deviations in brick colour... you wouldn't know.
Day 5
Electrics in, and some more plumbing sorted out (a side quest involving putting the taps the right way around in the bathroom). The electrics was a bigger job involving cabling a 20m run from the fuse box for each of the different circuits (sockets, boiler, hob) and chasing that at both ends and also routing the cables through the roof to get from one end of the house to the other. Additional work to chase and place all of the socket points needed. You can see in the photos where this cabling all now emerges from the ceiling in the wall where the cooker and boiler are.
Whilst this happened the builder handled tidying up the outside, repairing brickwork, repointing where needed around it, filling holes, etc. And aside from minor deviations in brick colour... you wouldn't know.
3 Attachments