Their stuff is an extension, ie. their house is intact at the moment. So definitely not "essential" but if they've got drawings done, quotes and all that shit, presumably no one wants to push it back. They were going to stay at ours while the work was done so that's why I'm curious about possible delays :)
When not getting it done means water pisses in through my ceiling and runs through the walls in the rest of the house, I would say yes. If it was I just because I fancied slate tiles instead of concrete, I would say no.
The windows on the other hand, we really could do with them being done, but would accept if we have to wait until after LD3 as they need to do a full survey inside and out.