Just heard from Rotor and the new cranks should arrive today... amazing to get them so soon!
In the meantime, courtesy of Seabass, the pewter CK 2nut is now on the Dawes, so I can finally run a headset cable hanger and the wire travels in a nice straight line down to the bridge.
I also removed the fork crown light attachment, drilled a hole in the mudguard and used the Isen bracket left over from the Varonha parts splurge.
I didn't take any 'before' photos but trust me, it was a mess!
Just heard from Rotor and the new cranks should arrive today... amazing to get them so soon!
In the meantime, courtesy of Seabass, the pewter CK 2nut is now on the Dawes, so I can finally run a headset cable hanger and the wire travels in a nice straight line down to the bridge.
I also removed the fork crown light attachment, drilled a hole in the mudguard and used the Isen bracket left over from the Varonha parts splurge.
I didn't take any 'before' photos but trust me, it was a mess!
1 Attachment